| Donation Details |
Approx cost in(INR) |
|
| 1250 kg Sand (Rs.450), 4 bags cement (Rs.1000), 100 stones for bed (Rs.150) |
1600.00 |
|
| 5 man days of non technical labor to prepare foundation, shade and transfer of materials |
500.00 |
|
| 5 man days of skilled labor for wall construction, bed and plaster work |
1000.00 |
|
| 6 Poles for shade support, 2 kilos or 200 earth worms (Rs.200) |
700.00 |
|
| 600 Blocks for pit size 9 " X 4" X 3.5" |
1900.00 |
|
| Materials for compost preparation (waste jute bags, cow dung, dry leaves, sugar factory waste) |
550.00 |
|